| Boston BERDO 2.020,000+ sq ft or 15+ units | Every 5 years | 2026 was a verification year; most buildings verify again in 2031 |
| Cambridge BEUDONon-residential | Baseline years and the first year of each compliance period | May 1, 2027 for properties of 100,000+ sq ft |
| Chicago50,000+ sq ft | Every 3 years | Your March notification letter says if 2027 is your year |
| Chula Vista BESOCovered buildings | 2027 reporting cycle | May 20, 2027 for 2026 data |
| Energize Denver25,000+ sq ft | Before the interim target, then after the final target year | First round was due June 1, 2026; next after your final target year |
| Detroit25,000+ sq ft | First deadline, then every third deadline | 2027 for 100,000+ sq ft; 2028 for 25,000–100,000 sq ft |
| Evanston20,000+ sq ft | Once, to set a verified baseline | Before 2030 if not verified since 2023 |
| Maryland BEPS35,000+ sq ft | Every 5 years | First round in 2026; next in 2031 |
| Montgomery County, MDCovered buildings | Every 3 years | Check whether 2027 is your building’s year |
| Newton BERDOCovered buildings | Second reporting year, then every 5 years | September 15, 2027 for most buildings |
| Seattle BEPS20,000+ sq ft | Before the first target, then every 5 years | October 1, 2027 for buildings over 90,000 sq ft; smaller buildings from 2028 to 2030 |
| Washington, DC10,000+ sq ft | Periodic verification cycles | May 3, 2027 filing (2026 data) |